Opportunity Information: Apply for NPS NOI WASO 2270100008
Apply for NPS NOI WASO 2270100008
- The National Park Service in the transportation sector is offering a public funding opportunity titled "Engineering Studies of Historic Truss Performance" and is now available to receive applicants.
- This funding opportunity was created on Jan 5, 2010 and posted on Jan 5, 2010.
- Applicants must submit their applications by Jan 14, 2010. (Agency may still review applications by suitable applicants for the remaining/unused allocated funding in 2026.)
- The funding agency has allocated a total of $50,000.00 to eligible and selected applicants.
- Each selected applicant is eligible to receive up to $50,000.00 in funding.
- The number of recipients for this funding is limited to 1 candidate(s).
- Eligible applicants include: Unrestricted (i.e., open to any type of entity above), subject to any clarification in text field entitled Additional Information on Eligibility.
[Watch] Creating a grant proposal using the step-by-step wizard inside the applicant portal:
Opportunity Summary:
The National Park Service, through its Heritage Documentation Programs and specifically the Historic American Engineering Record (HAER), offered a cooperative agreement to support a focused engineering research effort tied to a larger, multi-year Federal Highway Administration-funded initiative documenting historic covered bridges. The purpose of this grant was to generate rigorous, practical engineering documentation on how a historic truss actually behaves under load, addressing a well-known gap in preservation and bridge engineering where field testing is often difficult, disruptive, or impossible on active historic structures.
The work centers on a classic Howe truss configuration that uses cast iron nodes. Under the project, a representative truss would be selected, then disassembled, transported to an engineering laboratory, and reassembled specifically so controlled testing could be performed. The lab setting is a key feature of the opportunity because it allows researchers to run repeatable, instrumented experiments that would be risky or impractical on an in-service bridge. The planned testing sequence described in the announcement includes shoring the truss, loosening vertical members, installing instrumentation, tightening nuts to deliberately change stress levels in various members, removing the shoring, and then applying live loads. The measurements collected during these steps would produce a detailed picture of load paths, member forces, and overall structural response.
A major deliverable is a final report describing the behavior of the Howe truss under load, written in a way that is understandable and usable for practitioners. Beyond describing observed performance, the resulting dataset is intended to help calibrate analytical and computational models of Howe trusses, improving the accuracy of engineering assessments and rehabilitation designs. The National Park Service also notes that this engineering report is meant to complement HAERs standard documentation package for historic structures, which typically includes measured drawings, a historical report, and large-format photographs. Taken together, the documentation would strengthen both the historical record and the technical basis for preservation decisions.
The announcement emphasizes the broader value of the research because Howe trusses are relatively common within the surviving population of historic covered bridges, with roughly 140 still in existence. The findings are therefore expected to be applicable across many similar structures, supporting condition evaluation, load rating, repair planning, and preservation strategies. It may also inform the design of new covered bridges by providing real-world performance insights into a proven historic truss system.
Administratively, this was a discretionary funding opportunity using a cooperative agreement instrument, categorized under transportation. The estimated total funding was $50,000, with an award ceiling of $50,000 and no required cost sharing or matching. The opportunity anticipated making one award and was open to unrestricted applicants (open to any type of entity, subject to any further clarifications in the full announcement). The funding opportunity number was NPS NOI WASO 2270100008, it was posted on January 5, 2010, and it closed on January 14, 2010, with the archive date listed as February 13, 2010. The listed contact for access issues was Heidi Sage, Contract Specialist (Contractor), reachable at 303-969-2755 and heidisage@contractor.nps.gov.
Frequently Asked Questions (FAQs)
What agency offered this funding opportunity?
The opportunity was offered by the National Park Service (NPS) through its Heritage Documentation Programs, specifically the Historic American Engineering Record (HAER).
What type of award is this?
This was a cooperative agreement (noted as a discretionary funding opportunity).
What is the overall purpose of the project?
The purpose was to produce rigorous, practical engineering documentation showing how a historic truss actually behaves under load. The announcement highlights that this addresses a common preservation and bridge-engineering gap because field testing on active historic bridges can be difficult, disruptive, or impossible.
How does this project relate to historic covered bridges?
The work is tied to a larger, multi-year Federal Highway Administration (FHWA)-funded initiative documenting historic covered bridges. This cooperative agreement supports a focused engineering research effort within that broader documentation initiative.
What truss type is the research focused on?
The research centers on a classic Howe truss configuration that uses cast iron nodes.
Why is the project performed in a laboratory instead of on an in-service bridge?
The announcement emphasizes the lab setting because it allows controlled, repeatable, instrumented experiments. This approach avoids the risks and impracticalities of running disruptive tests on an active historic structure.
What is the general testing approach described in the announcement?
A representative truss would be selected, disassembled, transported to an engineering laboratory, and then reassembled specifically for controlled testing.
What testing sequence was planned?
The planned sequence described includes shoring the truss, loosening vertical members, installing instrumentation, tightening nuts to deliberately change stress levels in various members, removing the shoring, and then applying live loads.
What kinds of results or measurements are expected from the testing?
The measurements collected during the test steps are intended to produce a detailed picture of load paths, member forces, and overall structural response of the Howe truss under load.
What is the main deliverable?
A major deliverable is a final report describing the behavior of the Howe truss under load, written to be understandable and usable for practitioners.
How will the results be used beyond the final report?
The dataset generated is intended to help calibrate analytical and computational models of Howe trusses, improving the accuracy of engineering assessments and rehabilitation designs.
How does this work fit with HAER documentation?
NPS notes that the engineering report is meant to complement HAER's standard documentation package for historic structures, which typically includes measured drawings, a historical report, and large-format photographs.
Why does the announcement say the findings have broader value?
The announcement points out that Howe trusses are relatively common among surviving historic covered bridges, with roughly 140 still in existence. Because of that, findings are expected to be applicable across many similar structures.
What practical decisions could this research support?
The results are expected to support condition evaluation, load rating, repair planning, and broader preservation strategies for similar historic covered bridges.
Could this research inform the design of new covered bridges?
Yes. The announcement indicates the work may inform the design of new covered bridges by providing real-world performance insights into a proven historic truss system.
What funding category was listed for this opportunity?
The opportunity was categorized under transportation.
What was the estimated funding amount and maximum award?
The estimated total funding was $50,000. The award ceiling was also $50,000.
Was cost sharing or matching required?
No. The announcement states there was no required cost sharing or matching.
How many awards were anticipated?
The opportunity anticipated making one award.
Who was eligible to apply?
The opportunity was open to unrestricted applicants (open to any type of entity), subject to any further clarifications in the full announcement.
What is the funding opportunity number?
The funding opportunity number was NPS NOI WASO 2270100008.
When was the opportunity posted and when did it close?
It was posted on January 5, 2010, and it closed on January 14, 2010.
What was the archive date?
The archive date was listed as February 13, 2010.
Who is the contact person for access issues?
The listed contact for access issues was Heidi Sage, Contract Specialist (Contractor).
How can the contact person be reached?
Heidi Sage can be reached at 303-969-2755 and heidisage@contractor.nps.gov.
Browse more opportunities from the same agency: National Park Service
Browse more opportunities from the same category: Transportation
Next opportunity: Supporting the National Blood Transfusion Service in the Implementation and Expansion of Blood Safety Activities in the Republic of Cte d Ivoire under the President s Emergency Plan for AIDS Relief
Previous opportunity: Recovery Act Limited Competition NIH Basic Behavioral and Social Science Opportunity Network (OppNet) Short term Mentored Career Development Awards in the Basic Behavioral and Social Sciences for Mid career and Senior Investigators (K18)
USGrants.org Applicant Portal:
Are you interested in learning about about how to apply for this government funding opportunity? You can create a free applicant account and receive instant access to our applicant portal that many business owners like you have benefited from.
Apply for NPS NOI WASO 2270100008
[Watch] how do funding administrators access proposals?
Applicants also applied for:
Applicants who have applied for this opportunity (NPS NOI WASO 2270100008) also looked into and applied for these:
| Funding Opportunity |
|---|
| Capital and Training Assistance Program for Over the Road Bus Accessibility Apply for FTA 2010 003 TPM Funding Number: FTA 2010 003 TPM Agency: DOT/Federal Transit Administration Category: Transportation Funding Amount: $180,000 |
| FY09 Rail Line Relocation Railroad Bridge Rehabilitation, El Dorado, AR Apply for FR LRI 09 008 Funding Number: FR LRI 09 008 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $332,500 |
| FY 2010 National Scenic Byways Discretionary Grant Program Apply for FHWA 2010 BYWAYS Funding Number: FHWA 2010 BYWAYS Agency: DOT Federal Highway Administration Category: Transportation Funding Amount: Case Dependent |
| Pittsburgh Maglev Project Apply for FR MPS 10 001 Funding Number: FR MPS 10 001 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $889,200 |
| New England Transportation Consortium Research Study 05 5 Measurement of Adhesion Properties between Topcoat Paint and Metalized/Galvanized Steel with Surface Energy Measurement Equipment Apply for DTFH61 10 RA 00002 Funding Number: DTFH61 10 RA 00002 Agency: DOT Federal Highway Administration Category: Transportation Funding Amount: $20,012 |
| FY 2009 FY 2010 Rail Line Relocation and Improvement Funds West Freight Access Project, Port of Vancouver, WA Apply for FR LRI 10 001 Funding Number: FR LRI 10 001 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $3,872,000 |
| Crew Resource Management (CRM) Union Pacific Railroad Apply for RS RSR 10 001 Funding Number: RS RSR 10 001 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $200,000 |
| Crew Resource Management (CRM) Apply for RS RSR 10 002 Funding Number: RS RSR 10 002 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $152,000 |
| Transportation Emergency Response Training Apply for RS SEC 10 001 Funding Number: RS SEC 10 001 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $50,000 |
| FY08, 09 10 Rail Line Relocation Sacramento Intermodal Terminal Facility Apply for FR LRI 08 002 Funding Number: FR LRI 08 002 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $2,092,000 |
| Rail Line Relocation Earmark Grant 2009 Track Repair and Replacement on the Downeast Scenic Railroad Apply for FR LRI 09 009 Funding Number: FR LRI 09 009 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $190,000 |
| FY 2010 Rail Line Relocation Coos County Rail Safety Upgrades, Coos County, NH Apply for FR LRI 10 003 Funding Number: FR LRI 10 003 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $800,000 |
| FY 2009 Rail Line Relocation Earmark Grant Passenger Rail Corridor CREATE Project Apply for FR LRI 10 004 Funding Number: FR LRI 10 004 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $1,900,000 |
| FY 2010 Health Risks, Safety Incidents, and Traumatic Related Events (Union Pacific Railroad) Apply for RS RSR 10 003 Funding Number: RS RSR 10 003 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $70,000 |
| FY 2010 Locomotive Engine Waste Heat Recovery and Conversion Technology Apply for FR RRD 10 004 Funding Number: FR RRD 10 004 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $200,000 |
| FY 2010 Railroad Safety Technology Grant Program Apply for RS TEC 10 001 Funding Number: RS TEC 10 001 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $50,000,000 |
| FY 2010 High Speed Intercity Passenger Rail (HSIPR) Program Planning Grants Apply for FR HSR 10 001 Funding Number: FR HSR 10 001 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $50,000,000 |
| FY 2009 High Speed Intercity Passenger Rail Program Remaining Funds Apply for FR HSR 10 002 Funding Number: FR HSR 10 002 Agency: DOT/Federal Railroad Administration Category: Transportation Funding Amount: $65,000,000 |
| 2011 PHMSA HMEP States Territories Apply for HM HMP 11 001 Funding Number: HM HMP 11 001 Agency: PHMSA Hazmat Grants Category: Transportation Funding Amount: $1,050,000 |
| 2011 PHMSA HMEP Native American Tribes Apply for HM HMP 11 002 Funding Number: HM HMP 11 002 Agency: PHMSA Hazmat Grants Category: Transportation Funding Amount: Case Dependent |
Grant application guides and resources
It is always free to apply for government grants. However the process may be very complex depending on the funding opportunity you are applying for. Let us help you!
Apply for Grants

Premium leads for funding administrators, grant writers, and loan issuers
Thousands of people visit our website for their funding needs every day. When a user creates a grant proposal and files for submission, we pass the information on to funding administrators, grant writers, and government loan issuers.
If you manage government grant programs, provide grant writing services, or issue personal or government loans, we can help you reach your audience.
Subscribe to Leads
Request more information:
Would you like to learn more about this funding opportunity, similar opportunities to "NPS NOI WASO 2270100008", eligibility, application service, and/or application tips? Submit an inquiry below:
Don't forget to subscribe to our grant alerts mailing list to receive weekly alerts on new and updated grant funding opportunities like this one in your email.
