Opportunity Information: Apply for R13SF30002
Apply for R13SF30002
- The Bureau of Reclamation Lower Colorado Region in the natural resources sector is offering a public funding opportunity titled "Lower Colorado River Multi Species Conservation Program" and is now available to receive applicants.
- Interested and eligible applicants and submit their applications by referencing the CFDA number(s): 15.538 Lower Colorado River Multi Species Conservation Program..
- This funding opportunity was created on Dec 6, 2012 and posted on Nov 9, 2012.
- Applicants must submit their applications by Dec 28, 2012. (Agency may still review applications by suitable applicants for the remaining/unused allocated funding in 2026.)
- The funding agency has allocated a total of $100,000.00 to eligible and selected applicants.
- Each selected applicant is eligible to receive up to $100,000.00 in funding.
- The number of recipients for this funding is limited to 1 candidate(s).
- Eligible applicants include: Others (see text field entitled Additional Information on Eligibility for clarification).
- Any Federal, Interstate, Intrastate, State, and Local agencies, Public/Private organization/nonprofit institution, State Colleges or Universities, Public/Private Colleges or Universities, for profit companies, small businesses, or Federally recognized Indian Tribes.
[Watch] Creating a grant proposal using the step-by-step wizard inside the applicant portal:
Opportunity Summary:
The Lower Colorado River Multi-Species Conservation Program (LCR MSCP) grant opportunity, offered by the Bureau of Reclamation (Lower Colorado Region), is a discretionary funding announcement intended to hire one recipient to provide hands-on technical assistance for designing a conservation area at the Parker Dam Camp One site. The work focuses on creating an ecologically functional, disconnected backwater conservation area, with an emphasis on maximizing backwater acreage, incorporating marsh and riparian habitat where it makes sense, and keeping earthwork and long-term maintenance as low as practical. The award will be made as a cooperative agreement, meaning the government expects an active role and ongoing coordination rather than a simple one-time purchase of a deliverable.
The selected applicant is expected to move from early concepts to a final design in a fast, staged process that includes multiple presentations to the LCR MSCP and incorporation of feedback at each step. In the first phase, the contractor must develop two conceptual design alternatives and provide preliminary cost estimates that show rough cost differences between the options. These alternatives must clearly address core engineering and operations topics: how earthwork will be handled (including whether paved roads and sidewalks will be removed or integrated, how grading and contouring will be achieved, how cuts and fills will be balanced, and how ponds will be lined), how ponds will be supplied and drained (including pump count and placement, maintaining target water surface elevations, drainage methods, and an overall preference for reduced pumping and increased gravity-driven flow), how planted vegetation will be irrigated and for how long, and what the future operation and maintenance burden will look like (covering items such as berms, canals, liners, water control structures, pumps, roads, ponds, and created habitat types). A key theme throughout is practicality: minimize offsite disposal of material during construction, reduce energy-intensive pumping where possible, and avoid designs that create high ongoing maintenance obligations.
After presenting the two initial alternatives to the LCR MSCP and using the discussion to guide the next step, the recipient must refine the work into a single, more detailed conceptual alternative paired with a more detailed cost estimate. This estimate needs to be specific enough to support real decisions about whether certain features should stay in the design or be removed due to cost. Deliverables in this stage include a clearer accounting of acreages by land cover type (for example, how much area is marsh versus riparian) and a more complete construction cost picture.
The following phase advances the concept into a developed design that includes, at minimum, a general site plan with pond configuration and elevations, a water delivery system plan, and pond cross sections showing bank lines and adjacent riparian plantings. At this point the cost estimate is expected to be finalized to the best knowledge of the contractor and broken down clearly by materials, equipment, and personnel. The design and cost estimate are presented again to the LCR MSCP, where only minor suggestions are expected rather than major shifts.
Next, the contractor incorporates final comments and prepares a final design and cost estimate presentation for the LCR MSCP Steering Committee. This presentation is planned for the Steering Committee meeting in April 2013 (with the exact date and location to be provided later), and the presentation materials must be submitted to the LCR MSCP two days in advance for review. The project concludes with a final report and complete drawing set, delivered both as two hard copies and in an accessible electronic format (such as CD/DVD, email, or FTP). The overall schedule is tightly defined from the award date: draft alternatives within 30 calendar days, a single refined concept within 60 days, the developed design and final cost estimate within 70 days, and the final report and drawings within 100 days.
Administratively, this opportunity was posted November 9, 2012 (created December 6, 2012) under Funding Opportunity Number R13SF30002 and CFDA 15.538. The program anticipated making one award, with an estimated total funding amount of up to $100,000 (award ceiling $100,000; award floor $0). There is no cost-sharing or matching requirement. Eligibility is broad and includes federal, state, local, and tribal governments; public and private organizations including nonprofits; colleges and universities; for-profit companies and small businesses; and federally recognized Indian Tribes. The original closing date was December 10, 2012, later extended to December 28, 2012, and the opportunity was archived January 9, 2013. For access issues or questions, the listed contact was Shawna Thompson, Grants Officer, at 702-293-8570 or smthompson@usbr.gov.
Frequently Asked Questions (FAQs) - Lower Colorado River Multi-Species Conservation Program (LCR MSCP) Grant
1) What is this grant opportunity for?
This discretionary funding opportunity is intended to select one recipient to provide hands-on technical assistance to design a conservation area at the Parker Dam Camp One site. The design focus is an ecologically functional, disconnected backwater conservation area.
2) Who is offering this funding opportunity?
The opportunity is offered by the Bureau of Reclamation (Lower Colorado Region) under the Lower Colorado River Multi-Species Conservation Program (LCR MSCP).
3) What type of award will be made?
The award will be made as a cooperative agreement. This means the government expects to play an active role, including ongoing coordination, rather than simply purchasing a one-time deliverable.
4) How many awards were expected?
The program anticipated making one award.
5) How much funding is available?
The estimated total funding amount is up to $100,000. The award ceiling is $100,000 and the award floor is $0.
6) Is cost sharing or a match required?
No. There is no cost-sharing or matching requirement.
7) Who is eligible to apply?
Eligibility is broad and includes: federal, state, local, and tribal governments; public and private organizations including nonprofits; colleges and universities; for-profit companies and small businesses; and federally recognized Indian Tribes.
8) What is the site and what is being designed?
The work is to design a conservation area at the Parker Dam Camp One site. The intended outcome is a disconnected backwater conservation area designed to be ecologically functional.
9) What are the main design goals emphasized in the announcement?
Key goals include maximizing backwater acreage, incorporating marsh and riparian habitat where appropriate, keeping earthwork as low as practical, and keeping long-term operation and maintenance demands as low as practical.
10) What practical constraints or preferences are highlighted?
The opportunity emphasizes practicality, including minimizing offsite disposal of material during construction, reducing energy-intensive pumping where possible, favoring increased gravity-driven flow where feasible, and avoiding designs that create high ongoing maintenance obligations.
11) What is the overall process the recipient is expected to follow?
The recipient is expected to move quickly from early concepts to a final design in a staged process. The process includes multiple presentations to the LCR MSCP and incorporation of feedback at each step, culminating in a final presentation to the LCR MSCP Steering Committee and delivery of a final report and complete drawing set.
12) What are the first-phase deliverables?
In the first phase, the recipient must develop two conceptual design alternatives and provide preliminary cost estimates showing rough cost differences between the options. The alternatives must address core engineering and operations topics such as earthwork handling, pond supply and drainage, vegetation irrigation, and future operation and maintenance burden.
13) What specific earthwork topics must the conceptual alternatives address?
The conceptual alternatives must address how earthwork will be handled, including whether paved roads and sidewalks will be removed or integrated, how grading and contouring will be achieved, how cuts and fills will be balanced, and how ponds will be lined.
14) What water supply and drainage considerations must be addressed?
The alternatives must address how ponds will be supplied and drained, including pump count and placement, maintaining target water surface elevations, drainage methods, and an overall preference for reduced pumping and increased gravity-driven flow.
15) What does the opportunity require regarding vegetation and irrigation?
The recipient must address how planted vegetation will be irrigated and for how long.
16) What operation and maintenance (O&M) elements must be considered?
The alternatives must include a view of future operation and maintenance burdens, covering items such as berms, canals, liners, water control structures, pumps, roads, ponds, and the created habitat types.
17) What happens after the two initial alternatives are presented?
After presenting the two initial alternatives to the LCR MSCP and using the discussion to guide the next step, the recipient must refine the work into a single, more detailed conceptual alternative with a more detailed cost estimate.
18) How detailed must the refined conceptual alternative cost estimate be?
The refined estimate must be specific enough to support real decisions about whether certain features should remain in the design or be removed due to cost.
19) What additional information must be included in the refined conceptual stage?
Deliverables include a clearer accounting of acreages by land cover type (for example, how much area is marsh versus riparian) and a more complete construction cost picture.
20) What is included in the developed design phase?
The developed design must include, at minimum: a general site plan with pond configuration and elevations, a water delivery system plan, and pond cross sections showing bank lines and adjacent riparian plantings.
21) What are the requirements for the final cost estimate?
The cost estimate is expected to be finalized to the best knowledge of the contractor and clearly broken down by materials, equipment, and personnel.
22) How many presentations are expected, and to whom?
The staged process includes multiple presentations to the LCR MSCP, and a final design and cost estimate presentation to the LCR MSCP Steering Committee after final comments are incorporated.
23) When is the Steering Committee presentation planned?
The Steering Committee presentation is planned for the Steering Committee meeting in April 2013. The exact date and location were to be provided later.
24) When must presentation materials be submitted before the Steering Committee meeting?
Presentation materials must be submitted to the LCR MSCP two days in advance for review.
25) What must be delivered at the end of the project?
The project concludes with a final report and a complete drawing set, delivered as two hard copies and also in an accessible electronic format such as CD/DVD, email, or FTP.
26) What is the project schedule from the award date?
The schedule is tightly defined from the award date: draft alternatives within 30 calendar days; a single refined concept within 60 days; the developed design and final cost estimate within 70 days; and the final report and drawings within 100 days.
27) What is the Funding Opportunity Number and CFDA number?
The Funding Opportunity Number is R13SF30002 and the CFDA number is 15.538.
28) When was the opportunity posted and when did it close?
It was posted on November 9, 2012 (created December 6, 2012). The original closing date was December 10, 2012, later extended to December 28, 2012.
29) What does it mean that the opportunity was archived?
The opportunity was archived on January 9, 2013, indicating it is no longer an active, open solicitation under that posting.
30) Who is the contact for access issues or questions?
The listed contact is Shawna Thompson, Grants Officer. Phone: 702-293-8570. Email: smthompson@usbr.gov.
Browse more opportunities from the same category: Natural Resources
Next opportunity: Desalination and Water Purification Research and Development (DWPR) Pre proposal Solicitation
Previous opportunity: Limited Competition Collaborative Partnership to Advance Global Biomedical Research Programs (U01)
USGrants.org Applicant Portal:
Are you interested in learning about about how to apply for this government funding opportunity? You can create a free applicant account and receive instant access to our applicant portal that many business owners like you have benefited from.
Apply for R13SF30002
[Watch] how do funding administrators access proposals?
Applicants also applied for:
Applicants who have applied for this opportunity (R13SF30002) also looked into and applied for these:
| Funding Opportunity |
|---|
| Desalination and Water Purification Research and Development (DWPR) Pre proposal Solicitation Apply for R13SF80004 Funding Number: R13SF80004 Agency: Bureau of Reclamation Denver Office Category: Natural Resources Funding Amount: $200,000 |
| CTUIR Monitoring and Evaluation Apply for F13AS00018 Funding Number: F13AS00018 Agency: Fish and Wildlife Service Category: Natural Resources Funding Amount: $260,370 |
| Bay Delta Restoration Program CALFED Water Use Efficiency Grants Apply for R13AF20004 Funding Number: R13AF20004 Agency: Bureau of Reclamation Mid Pacific Region Category: Natural Resources Funding Amount: $500,000 |
| Water Conservation Field Services Program Great Plains Region, Eastern Colorado Area Office Apply for R13SF60002 Funding Number: R13SF60002 Agency: Bureau of Reclamation Great Plains Region Category: Natural Resources Funding Amount: $100,000 |
| Water Conservation Field Services Program Great Plains Region, Oklahoma Texas Area Office Apply for R13SF60003 Funding Number: R13SF60003 Agency: Bureau of Reclamation Great Plains Region Category: Natural Resources Funding Amount: $100,000 |
| Water Conservation Field Services Program Great Plains Region, Nebraska Kansas Area Office Apply for R13SF60004 Funding Number: R13SF60004 Agency: Bureau of Reclamation Great Plains Region Category: Natural Resources Funding Amount: $100,000 |
| Water Conservation Field Services Program Great Plains Region, Wyoming Area Office Apply for R13SF60005 Funding Number: R13SF60005 Agency: Bureau of Reclamation Great Plains Region Category: Natural Resources Funding Amount: $100,000 |
| Blackfoot River Recreation Management Partnership Apply for L13AS00003 Funding Number: L13AS00003 Agency: Bureau of Land Management Category: Natural Resources Funding Amount: $15,000 |
| BLM CESU Design Validation Evaluation Monitoring Protocols for Arid Ecosystems Apply for L13AS00005 Funding Number: L13AS00005 Agency: Bureau of Land Management Category: Natural Resources Funding Amount: $99,000 |
| CESU Arizona Translocation Analysis for Flat tailed Horned Lizard (FTHL) Apply for L13AS00006 Funding Number: L13AS00006 Agency: Bureau of Land Management Category: Natural Resources Funding Amount: $25,000 |
| Sustainable Landscapes, Clean Energy and Adaptation Apply for APS OAA 12 000003 ADDENDUM Funding Number: APS OAA 12 000003 ADDENDUM Agency: Agency for International Development Category: Natural Resources Funding Amount: $10,000,000 |
| Water Conservation Field Services Program Southern California Area Office Apply for R13SF35001 Funding Number: R13SF35001 Agency: Bureau of Reclamation Lower Colorado Region Category: Natural Resources Funding Amount: $100,000 |
| Water Conservation Field Services Program Yuma Area Office Apply for R13SF34001 Funding Number: R13SF34001 Agency: Bureau of Reclamation Lower Colorado Region Category: Natural Resources Funding Amount: $220,000 |
| Land Management and Conservation Internship Opportunities in MT/Dakotas Apply for L13AS00007 Funding Number: L13AS00007 Agency: Bureau of Land Management Category: Natural Resources Funding Amount: $114,000 |
| Idaho Comprehensive Wildlife Conservation Strategy (CWCS) FY 2013 Apply for L13AS00009 Funding Number: L13AS00009 Agency: Bureau of Land Management Category: Natural Resources Funding Amount: $450,000 |
| BLM Utah Youth Initiative Program FY 2013 Apply for L13AS00008 Funding Number: L13AS00008 Agency: Bureau of Land Management Category: Natural Resources Funding Amount: $50,000 |
| BLM CESU Western Snowy Plover Recovery Wildlife Conservation Program Plan Arcata Field Office area Apply for L13AS00010 Funding Number: L13AS00010 Agency: Bureau of Land Management Category: Natural Resources Funding Amount: $150,000 |
| Water Conservation Field Services Program Phoenix Area Office Apply for R13SF32001 Funding Number: R13SF32001 Agency: Bureau of Reclamation Lower Colorado Region Category: Natural Resources Funding Amount: $25,000 |
| Hawaiian Duck Monitoring Study Apply for F13AS00042 Funding Number: F13AS00042 Agency: Fish and Wildlife Service Category: Natural Resources Funding Amount: $25,000 |
| Adaptation of Western US Agriculture to Climate Change Induced Water Scarcity Apply for R12AC80006 Funding Number: R12AC80006 Agency: Bureau of Reclamation Denver Office Category: Natural Resources Funding Amount: $87,000 |
Grant application guides and resources
It is always free to apply for government grants. However the process may be very complex depending on the funding opportunity you are applying for. Let us help you!
Apply for Grants

Premium leads for funding administrators, grant writers, and loan issuers
Thousands of people visit our website for their funding needs every day. When a user creates a grant proposal and files for submission, we pass the information on to funding administrators, grant writers, and government loan issuers.
If you manage government grant programs, provide grant writing services, or issue personal or government loans, we can help you reach your audience.
Subscribe to Leads
Request more information:
Would you like to learn more about this funding opportunity, similar opportunities to "R13SF30002", eligibility, application service, and/or application tips? Submit an inquiry below:
Don't forget to subscribe to our grant alerts mailing list to receive weekly alerts on new and updated grant funding opportunities like this one in your email.