Opportunity Information: Apply for BOR MP 16 N015

  • The Department of the Interior, Bureau of Reclamation in the natural resources sector is offering a public funding opportunity titled "Hemlock Project" and is now available to receive applicants.
  • Interested and eligible applicants and submit their applications by referencing the CFDA number(s): 15.517.
  • This funding opportunity was created on Jul 20, 2016.
  • Applicants must submit their applications by Jul 29, 2016. (Agency may still review applications by suitable applicants for the remaining/unused allocated funding in 2026.)
  • Each selected applicant is eligible to receive up to $300,000.00 in funding.
  • The number of recipients for this funding is limited to 1 candidate(s).
  • Eligible applicants include: Public and State controlled institutions of higher education.
Apply for BOR MP 16 N015

[Watch] Creating a grant proposal using the step-by-step wizard inside the applicant portal:

Opportunity Summary:

The Hemlock Project is a Bureau of Reclamation discretionary grant opportunity focused on a growing problem in the Sierra Nevada: decades of intensive fire management have left many forests much denser than they were under more natural fire regimes. That increased density has led to heavy fuel buildup in many watersheds, and when those high fuel loads meet today s warmer, drier conditions, the result is a higher likelihood of severe, fast moving wildfires. The opportunity is built around the idea that selective thinning and other science-based forest restoration approaches can reduce stand density to more sustainable levels, improving wildfire resilience while also changing how water moves through these mountain watersheds.

A central theme of the project is that forest structure does not just affect fire behavior; it also affects the water cycle in several measurable ways. The description highlights three main hydrologic pathways influenced by thinning. First, reducing tree density can lower evapotranspiration, meaning less water is returned to the atmosphere through evaporation and plant water use, and more of the precipitation has a chance to become runoff. Second, thinning can shift the timing of snowmelt and runoff. Third, it can increase how much snow actually accumulates on the forest floor. In dense stands, snow can be intercepted and held in the canopy where it is more likely to sublimate or melt and evaporate. A more open canopy can allow more snowfall to reach the ground. At the same time, the project notes that how openings are created matters: strategic spacing can limit early season sunlight on the snowpack and slow melt, effectively extending snow storage and delaying runoff into later parts of the season.

The purpose and objective of the Hemlock Project are to quantitatively evaluate how different forest stand structures influence wildfire resilience, water yield, and broader water cycle behavior specifically in the snow rain transition zone. That zone is particularly important because small changes in temperature and storm patterns can flip precipitation between rain and snow, which strongly affects runoff timing, flood risk, and late season water availability. The project plans to do this through a combination of field based catchment measurements, hydrologic monitoring, and integration of observations using hydrologic modeling followed by assessment. A major deliverable implied in the description is a set of data driven tools and methods that can identify vegetation densities and stand structures that best balance hydrologic benefits and wildfire resilience.

A notable applied outcome is that the project is designed to support real management decisions in watersheds that matter for California s major water supply systems, including areas serving the Central Valley Project and the State Water Project. The opportunity description points to preliminary estimates suggesting that optimizing forest density across Sierra watersheds could yield roughly 1 million acre feet of additional runoff in average water years, framing the work as potentially significant not only for ecosystem resilience but also for downstream water supply.

From an implementation standpoint, the project was described as being in the permitting and hydrologic data acquisition planning phase at the time of the announcement. UC Merced was scheduled to install a fairly robust monitoring network during the summer and fall, including two complete weather stations, three clusters that monitor soil moisture, soil metric potential, and snow conditions, plus four water stage recorders to track stream or channel response. This monitoring infrastructure indicates the grant is oriented toward rigorous, instrumented watershed science that can support model calibration and defensible estimates of how thinning treatments translate into changes in snowpack dynamics, evapotranspiration, and runoff.

Administratively, the opportunity (Funding Opportunity Number BOR MP 16 N015; CFDA 15.517) was offered by the Department of the Interior, Bureau of Reclamation as a grant with an award ceiling of 300,000 dollars and an expectation of one award. Eligibility was limited to public and state controlled institutions of higher education. The posting date was July 20, 2016 with an original closing date of July 29, 2016, indicating a narrow application window for a targeted research effort tied to Sierra Nevada watershed and forest management priorities.

Hemlock Project Grant Opportunity FAQs

What is the Hemlock Project grant opportunity?

The Hemlock Project is a Bureau of Reclamation discretionary grant opportunity focused on studying how science-based forest restoration (including selective thinning) in the Sierra Nevada can improve wildfire resilience and influence water movement through mountain watersheds.

Which agency is offering this funding opportunity?

The opportunity was offered by the U.S. Department of the Interior, Bureau of Reclamation.

What is the Funding Opportunity Number (FON) for this grant?

The Funding Opportunity Number listed is BOR MP 16 N015.

What is the CFDA number associated with this opportunity?

The CFDA number provided is 15.517.

What problem is the Hemlock Project trying to address?

The project targets a growing issue in the Sierra Nevada: decades of intensive fire management have increased forest density beyond levels typical under more natural fire regimes. This has contributed to heavy fuel buildup. Combined with warmer, drier conditions, these fuel loads increase the likelihood of severe, fast-moving wildfires.

How does the project connect forest management to water resources?

The opportunity is built around the idea that forest stand structure affects both fire behavior and the watershed water cycle. By reducing stand density through selective thinning and related restoration approaches, the project expects changes in evapotranspiration, snow accumulation, snowmelt timing, and runoff behavior.

What are the main hydrologic pathways the project says are influenced by thinning?

The description highlights three primary pathways:

  • Reduced evapotranspiration: Fewer trees can mean less water returned to the atmosphere via evaporation and plant water use, leaving more precipitation available to become runoff.
  • Changes in snowmelt and runoff timing: Thinning can shift when snow melts and when runoff occurs.
  • Increased snow accumulation on the forest floor: A more open canopy can allow more snowfall to reach the ground rather than being intercepted in the canopy, where it is more likely to sublimate or melt and evaporate.

Why does canopy opening and spacing matter for snowpack?

The opportunity notes that it is not only the amount of thinning that matters, but also how openings are created. Strategic spacing can limit early-season sunlight on the snowpack, slowing melt. This can extend snow storage and delay runoff later into the season.

What is the purpose and objective of the Hemlock Project?

The purpose is to quantitatively evaluate how different forest stand structures influence wildfire resilience, water yield, and broader water-cycle behavior, with a focus on the snow-rain transition zone.

What is the snow-rain transition zone, and why is it important in this project?

The snow-rain transition zone is an area where small changes in temperature and storm patterns can shift precipitation between rain and snow. This matters because rain versus snow strongly affects runoff timing, flood risk, and late-season water availability. The project is specifically focused on understanding stand-structure effects in this sensitive zone.

What approach or methods does the project plan to use?

The description indicates a combined approach of field-based catchment measurements, hydrologic monitoring, and integration of observations through hydrologic modeling, followed by assessment.

What deliverables or outcomes are implied by the opportunity description?

A major implied deliverable is a set of data-driven tools and methods to identify vegetation densities and stand structures that best balance hydrologic benefits (such as water yield and snowpack behavior) with wildfire resilience.

How is this project intended to support real-world management decisions?

The project is designed to inform management in watersheds important to California's major water supply systems, including areas serving the Central Valley Project and the State Water Project.

Does the opportunity provide any estimate of potential water-supply benefits?

Yes. The description references preliminary estimates suggesting that optimizing forest density across Sierra watersheds could yield roughly 1 million acre-feet of additional runoff in average water years.

What phase was the project in at the time of the announcement?

At the time of the announcement, the project was described as being in the permitting and hydrologic data acquisition planning phase.

What monitoring infrastructure was planned as part of implementation?

The opportunity describes plans for a robust monitoring network, scheduled for installation in the summer and fall, including:

  • Two complete weather stations
  • Three monitoring clusters for soil moisture, soil metric potential, and snow conditions
  • Four water stage recorders to track stream or channel response

What does the planned monitoring network suggest about the nature of the work?

The monitoring infrastructure described suggests the grant is oriented toward rigorous, instrumented watershed science capable of supporting hydrologic model calibration and defensible estimates of how thinning treatments affect snowpack dynamics, evapotranspiration, and runoff.

What type of award is being offered?

The opportunity was offered as a grant.

What is the maximum (ceiling) award amount?

The award ceiling listed is $300,000.

How many awards were expected?

The description indicates an expectation of one award.

Who was eligible to apply for this opportunity?

Eligibility was limited to public and state-controlled institutions of higher education.

When was the opportunity posted?

The posting date was July 20, 2016.

What was the original closing date for applications?

The original closing date was July 29, 2016.

What does the closing date suggest about the application window?

Based on the posted and closing dates, the application window was narrow, indicating a targeted research effort tied to specific Sierra Nevada watershed and forest management priorities.

Browse more opportunities from the same agency: Department of the Interior, Bureau of Reclamation

Browse more opportunities from the same category: Natural Resources

Next opportunity: Poliomyelitis Eradication Initiative and Expanded Programme On Immunization,

Previous opportunity: National Indian Health Outreach and Education I - Policy/Budget/Diabetes

USGrants.org Applicant Portal:

Are you interested in learning about about how to apply for this government funding opportunity? You can create a free applicant account and receive instant access to our applicant portal that many business owners like you have benefited from.

Apply for BOR MP 16 N015

 

[Watch] how do funding administrators access proposals?

Applicants also applied for:

Applicants who have applied for this opportunity (BOR MP 16 N015) also looked into and applied for these:

Funding Opportunity
Native American Youth Connect to National Parks Apply for P16AS00359

Funding Number: P16AS00359
Agency: Department of the Interior, National Park Service
Category: Natural Resources
Funding Amount: $64,000
Identification of genes encoding cell surface markers Apply for USGS 16 FA 0332

Funding Number: USGS 16 FA 0332
Agency: Department of the Interior, Geological Survey
Category: Natural Resources
Funding Amount: $148,572
Nason Creek Upper White Pine Construction Apply for BOR PN 16 N010

Funding Number: BOR PN 16 N010
Agency: Department of the Interior, Bureau of Reclamation
Category: Natural Resources
Funding Amount: $1,684,676
Identification of genes encoding cell surface markers Apply for USGS 16 FA 0331

Funding Number: USGS 16 FA 0331
Agency: Department of the Interior, Geological Survey
Category: Natural Resources
Funding Amount: $148,905
Notice of Intent Apply for USGS 16 FA 0372

Funding Number: USGS 16 FA 0372
Agency: Department of the Interior, Geological Survey
Category: Natural Resources
Funding Amount: $108,228
Notice of Intent: Wupatki and Sunset Crater NM Visitor Use Study Apply for P16AS00370

Funding Number: P16AS00370
Agency: Department of the Interior, National Park Service
Category: Natural Resources
Funding Amount: $50,602
Notice of Intent: Developing Skills and Methods for Landscape Scale Inventory and Evaluation of Cultural Resources Apply for P16AS00371

Funding Number: P16AS00371
Agency: Department of the Interior, National Park Service
Category: Natural Resources
Funding Amount: $120,845
Notice of Intent: Identification and Assessment of Degraded Wetland Areas Apply for P16AS00372

Funding Number: P16AS00372
Agency: Department of the Interior, National Park Service
Category: Natural Resources
Funding Amount: $10,000
National Park Service- Support conservation actions for Quitobaquito and Rio Sonoyta Apply for P16AS00377

Funding Number: P16AS00377
Agency: Department of the Interior, National Park Service
Category: Natural Resources
Funding Amount: $49,998
BLM WY Plant and Pollinator Species and Habitat Assessment, Inventory and Monitoring CESU Apply for L16AS00260

Funding Number: L16AS00260
Agency: Department of the Interior, Bureau of Land Management
Category: Natural Resources
Funding Amount: $500,000
Notice of Intent: Hallowed Grounds: Sites of African American Memories and the Relevance of National Park Service Sites and Programs Apply for P16AS00374

Funding Number: P16AS00374
Agency: Department of the Interior, National Park Service
Category: Natural Resources
Funding Amount: $65,000
National Heritage Area Collaborative Community Projects with NPS Units in Baltimore Region Apply for NPS 16 NERO 0113

Funding Number: NPS 16 NERO 0113
Agency: Department of the Interior, National Park Service
Category: Natural Resources
Funding Amount: Case Dependent
PIPA Volunteers Monitor California Condors Apply for P16AS00376

Funding Number: P16AS00376
Agency: Department of the Interior, National Park Service
Category: Natural Resources
Funding Amount: $60,000
Promote Research and Preservation on National Park Service Collections Apply for P16AS00380

Funding Number: P16AS00380
Agency: Department of the Interior, National Park Service
Category: Natural Resources
Funding Amount: $58,683
Notice of Intent: Administrative Support for the Chihuahuan Desert I&M Network in 2016 & 2017 Apply for P16AS00383

Funding Number: P16AS00383
Agency: Department of the Interior, National Park Service
Category: Natural Resources
Funding Amount: $70,000
Service Training and Technical Assistance (Generic Training) Apply for F16AS00366

Funding Number: F16AS00366
Agency: Department of the Interior, Fish and Wildlife Service
Category: Natural Resources
Funding Amount: $500,000
Notice of Intent Apply for USGS 16 FA C0229

Funding Number: USGS 16 FA C0229
Agency: Department of the Interior, Geological Survey
Category: Natural Resources
Funding Amount: $150,000
Notice of Intent - Glacial Mapping of Western Waushara County Wisconsin Apply for USGS FA 16 0334

Funding Number: USGS FA 16 0334
Agency: Department of the Interior, Geological Survey
Category: Natural Resources
Funding Amount: $51,000
Notice of Intent - Surficial Geologic Mapping Cass County, Michigan; Marcellus and Decatur Quadrangles Apply for USGS FA 16 0377

Funding Number: USGS FA 16 0377
Agency: Department of the Interior, Geological Survey
Category: Natural Resources
Funding Amount: $72,524
NOTICE OF INTENT TO AWARD - Identify Species Vulnerable to Climate Change at Acadia National Park Apply for NPS 16 NERO 0116

Funding Number: NPS 16 NERO 0116
Agency: Department of the Interior, National Park Service
Category: Natural Resources
Funding Amount: $158,856

 

Grant application guides and resources

It is always free to apply for government grants. However the process may be very complex depending on the funding opportunity you are applying for. Let us help you!

Apply for Grants

 

USGrants.org applicant portal membership

 

Premium leads for funding administrators, grant writers, and loan issuers

Thousands of people visit our website for their funding needs every day. When a user creates a grant proposal and files for submission, we pass the information on to funding administrators, grant writers, and government loan issuers.

If you manage government grant programs, provide grant writing services, or issue personal or government loans, we can help you reach your audience.

Subscribe to Leads

 

Request more information:

Would you like to learn more about this funding opportunity, similar opportunities to "BOR MP 16 N015", eligibility, application service, and/or application tips? Submit an inquiry below:

Don't forget to subscribe to our grant alerts mailing list to receive weekly alerts on new and updated grant funding opportunities like this one in your email.