Opportunity Information: Apply for F15AS00043
Apply for F15AS00043
- The Fish and Wildlife Service in the natural resources sector is offering a public funding opportunity titled "Concept Engineering Design Services and installation of wetland management infrastructure for the Valle de Oro NWR and Sevilleta NWR Floodplain and Wetland Restoration Project" and is now available to receive applicants.
- Interested and eligible applicants and submit their applications by referencing the CFDA number(s): 15.654 Visitor Facility Enhancements Refuges and Wildlife.
- This funding opportunity was created on Dec 8, 2014 and posted on Dec 8, 2014.
- Applicants must submit their applications by Dec 12, 2014. (Agency may still review applications by suitable applicants for the remaining/unused allocated funding in 2026.)
- The funding agency has allocated a total of $300,000.00 to eligible and selected applicants.
- Each selected applicant is eligible to receive up to $360,000.00 in funding.
- The number of recipients for this funding is limited to 1 candidate(s).
- Eligible applicants include: Nonprofits having a 501(c)(3) status with the IRS, other than institutions of higher education.
[Watch] Creating a grant proposal using the step-by-step wizard inside the applicant portal:
Opportunity Summary:
This funding opportunity (Funding Opportunity Number F15AS00043) is a Fish and Wildlife Service cooperative agreement focused on advancing floodplain, wetland, and riparian habitat restoration at two National Wildlife Refuges in New Mexico: Valle de Oro NWR and Sevilleta NWR. It is described as a modification to a single-source award, meaning the agency is directing the work to a specific partner rather than running an open competition. The core purpose is to produce concept-level engineering designs at roughly the 30 percent design stage and to carry out or procure key pieces of water management infrastructure needed to improve site hydrology and reliably manage wetlands over time. The project sits within the Natural Resources activity area and is connected to broader refuge development goals, including habitat creation, wildlife benefits, and practical floodplain management functions for the Albuquerque and Bernalillo County area.
The work is centered on a close collaboration between the U.S. Fish and Wildlife Service (the landowner and refuge manager) and Ducks Unlimited (DU), which is named as the partner responsible for developing the conceptual plans and helping deliver infrastructure. DU is expected to use existing datasets and background information supplied by the Service and its partners to draft conceptual layouts for wetland and habitat features. Coordination is a major requirement: DU is expected to work closely with refuge staff and other firms involved in refuge development, participate in at least bi-weekly check-ins, and make at least one trip to the refuges to gather background information and receive on-the-ground guidance. The Service also anticipates DU coordinating with other contractors either directly or through the designated project leader/officer so that engineering concepts and constructed elements align with the larger refuge buildout and restoration strategy.
A key driver behind the project is a Memo of Understanding between Valle de Oro NWR and the Bureau of Reclamation. Under that partnership, the refuges are working to create wetland habitat at Valle de Oro and to develop habitat conditions suitable for the endangered Southwestern Willow Flycatcher at Sevilleta. The description notes that wetland habitat can be created on-site at Valle de Oro, while Sevilleta is considered to offer the best opportunity within the Middle Rio Grande region to develop viable Southwestern Willow Flycatcher habitat on a National Wildlife Refuge. The project is also meant to support Valle de Oro NWRs mission through education and outreach tied to Middle Rio Grande conservation and the partnership with Reclamation, linking engineering and habitat outcomes to public-facing refuge programming.
The scope of work includes four main deliverables. First, DU will work with the Service to design and install a groundwater supply well at Valle de Oro NWR, improving the refuges ability to provide dependable water for wetland management. Second, DU will purchase any additional water management infrastructure for Valle de Oro that both parties agree is necessary, which could include components that help move, control, or distribute water across planned wetland cells or habitat areas. Third, DU will purchase a water control structure for Sevilleta NWR to enhance and restore a wetland specifically intended to benefit the Southwestern Willow Flycatcher, strengthening the refuges capacity to manage water levels and wetland conditions for endangered species needs. Fourth, beyond the initial 30 percent concept designs, DU will provide additional engineering design work for Valle de Oro as the project progresses, indicating the effort may advance toward more detailed design readiness as decisions are made and infrastructure needs are clarified.
The Fish and Wildlife Service emphasizes that it will be substantially involved throughout the project, rather than simply providing funds and stepping back. The Service will support DU with technical direction and foundational inputs, including desired habitat conditions for both refuges; baseline information on groundwater, surface water, and topography at Valle de Oro; outputs from wetland workshops conducted for Valle de Oro and Sevilleta; and specific hydrogeologic information such as aquifer properties and recommended production zones for the new well at Valle de Oro. For Sevilleta, the Service will also provide design-relevant requirements such as gate sizing and functional characteristics for the irrigation gate or comparable water control structure, ensuring the purchased structure matches operational needs and restoration goals.
From an administrative standpoint, the opportunity is categorized as discretionary and uses a cooperative agreement instrument, reflecting the hands-on federal role in planning and implementation. It anticipates a single award, with an estimated total funding amount of $300,000 and an award range listed from $60,000 (floor) to $360,000 (ceiling). There is no cost-share or matching requirement stated. Eligibility is limited to nonprofits with 501(c)(3) status (excluding institutions of higher education), although the narrative makes clear that this particular announcement is structured as a single-source modification with DU as the intended implementing partner. The opportunity was posted December 8, 2014, with a closing date of December 12, 2014, and was archived December 7, 2015. A grants contact is provided for access issues: Michelle Willcox, Grants Specialist, 505-248-7486, michellewillcox@fws.gov.
Frequently Asked Questions (FAQs)
What is Funding Opportunity Number F15AS00043?
F15AS00043 is a U.S. Fish and Wildlife Service (FWS) funding opportunity offered as a cooperative agreement. The project focuses on floodplain, wetland, and riparian habitat restoration work at two National Wildlife Refuges in New Mexico: Valle de Oro National Wildlife Refuge (NWR) and Sevilleta NWR.
Which agency is offering this opportunity?
The opportunity is offered by the U.S. Fish and Wildlife Service (FWS).
What type of funding instrument is being used?
The instrument is a cooperative agreement, which indicates the Fish and Wildlife Service expects to be substantially involved in the planning and implementation of the project rather than only providing funding.
Is this an open, competitive grant opportunity?
No. The announcement is described as a modification to a single-source award. That means the agency is directing the work to a specific partner rather than running an open competition.
Who is the intended partner for this single-source award modification?
Ducks Unlimited (DU) is identified as the partner responsible for developing the conceptual plans and helping deliver water management infrastructure as part of this effort.
What is the main purpose of the project?
The core purpose is to advance habitat restoration by producing concept-level engineering designs (approximately the 30 percent design stage) and carrying out or procuring key water management infrastructure needed to improve hydrology and enable reliable long-term wetland management.
Which locations will the project work take place in?
The work is focused on two sites in New Mexico: Valle de Oro NWR and Sevilleta NWR.
What natural resource areas does the project address?
The project is tied to floodplain, wetland, and riparian habitat restoration and is categorized within the Natural Resources activity area.
How does this project connect to broader refuge development goals?
The effort is described as supporting broader refuge development goals that include habitat creation, wildlife benefits, and practical floodplain management functions for the Albuquerque and Bernalillo County area.
What role will Ducks Unlimited (DU) play under this agreement?
DU is expected to develop conceptual plans and assist in delivering infrastructure. DU will use existing datasets and background information provided by FWS and partners, coordinate closely with refuge staff and other involved firms, and participate in regular project check-ins and site coordination.
What level of design is expected at the outset?
The initial design work is described as concept-level engineering at roughly the 30 percent design stage.
Will the project include additional engineering beyond the initial concept designs?
Yes. In addition to the initial 30 percent concept designs, DU is expected to provide additional engineering design work for Valle de Oro as the project progresses.
What are the main deliverables described in the scope of work?
The scope lists four main deliverables: (1) design and installation of a groundwater supply well at Valle de Oro NWR; (2) purchase of additional water management infrastructure for Valle de Oro as mutually agreed by DU and FWS; (3) purchase of a water control structure for Sevilleta NWR to enhance and restore a wetland intended to benefit the endangered Southwestern Willow Flycatcher; and (4) additional engineering design work for Valle de Oro beyond the initial concept designs as the project advances.
What infrastructure is planned for Valle de Oro NWR?
Valle de Oro deliverables include designing and installing a groundwater supply well and purchasing additional water management infrastructure that both FWS and DU agree is necessary to move, control, or distribute water across planned wetland cells or habitat areas.
What infrastructure is planned for Sevilleta NWR?
Sevilleta deliverables include purchasing a water control structure intended to enhance and restore a wetland designed to benefit the endangered Southwestern Willow Flycatcher. The description also notes design-relevant requirements such as gate sizing and functional characteristics for an irrigation gate or similar structure.
Why is a groundwater supply well included for Valle de Oro?
The well is intended to improve Valle de Oro NWR's ability to provide dependable water for wetland management, supporting more reliable long-term control of wetland conditions.
What is driving the refuge habitat work described in this announcement?
A key driver is a Memorandum of Understanding (MOU) between Valle de Oro NWR and the Bureau of Reclamation. Under that partnership, the refuges are working to create wetland habitat at Valle de Oro and to develop habitat conditions suitable for the endangered Southwestern Willow Flycatcher at Sevilleta.
How does Sevilleta NWR relate to Southwestern Willow Flycatcher habitat goals?
The description states Sevilleta is considered to offer the best opportunity within the Middle Rio Grande region to develop viable Southwestern Willow Flycatcher habitat on a National Wildlife Refuge, and the Sevilleta water control structure is intended to support wetland conditions for this endangered species.
How does Valle de Oro NWR relate to wetland creation goals?
The description notes that wetland habitat can be created on-site at Valle de Oro, and the planned water supply and water management infrastructure are intended to help make that feasible and manageable over time.
What coordination requirements are included for DU?
DU is expected to coordinate closely with refuge staff and other firms involved in refuge development, participate in at least bi-weekly check-ins, and make at least one trip to the refuges to gather background information and receive on-the-ground guidance. The announcement also anticipates DU coordinating with other contractors either directly or through the designated project leader/officer to ensure alignment with the larger refuge buildout strategy.
How involved will the Fish and Wildlife Service be during the project?
FWS indicates it will be substantially involved, providing technical direction and foundational inputs rather than simply issuing funds and stepping back.
What information and technical inputs will FWS provide to support the work?
FWS will support DU with desired habitat conditions for both refuges; baseline groundwater, surface water, and topography information for Valle de Oro; outputs from wetland workshops conducted for Valle de Oro and Sevilleta; hydrogeologic information such as aquifer properties and recommended production zones for the Valle de Oro well; and, for Sevilleta, design-relevant requirements such as gate sizing and functional characteristics for the irrigation gate or comparable water control structure.
What is the total estimated funding amount for this opportunity?
The estimated total funding amount is $300,000.
What is the stated award range?
The award range is listed as $60,000 (floor) to $360,000 (ceiling).
Is cost share or matching required?
No cost-share or matching requirement is stated in the provided description.
How many awards are anticipated?
The opportunity anticipates a single award.
Who is eligible to apply based on the eligibility category?
Eligibility is limited to nonprofits with 501(c)(3) status (excluding institutions of higher education). However, the description also makes clear this announcement is structured as a single-source modification with Ducks Unlimited as the intended implementing partner.
When was the opportunity posted and when did it close?
The opportunity was posted on December 8, 2014, and it closed on December 12, 2014.
When was the opportunity archived?
The opportunity was archived on December 7, 2015.
Who can be contacted for grant access issues, and how?
The contact provided for access issues is Michelle Willcox, Grants Specialist. Phone: 505-248-7486. Email: michellewillcox@fws.gov.
What kinds of outcomes is the project intended to support beyond engineering and construction?
The description indicates the project is meant to support Valle de Oro NWR's mission through education and outreach tied to Middle Rio Grande conservation and the partnership with the Bureau of Reclamation, linking engineering and habitat outcomes to public-facing refuge programming.
Browse more opportunities from the same agency: Fish and Wildlife Service
Browse more opportunities from the same category: Natural Resources
Next opportunity: MOSIAC SBIR/STTR
Previous opportunity: R6 Sport Fish Restoration Grant Program STATE FG AGENCIES ONLY
USGrants.org Applicant Portal:
Are you interested in learning about about how to apply for this government funding opportunity? You can create a free applicant account and receive instant access to our applicant portal that many business owners like you have benefited from.
Apply for F15AS00043
[Watch] how do funding administrators access proposals?
Applicants also applied for:
Applicants who have applied for this opportunity (F15AS00043) also looked into and applied for these:
| Funding Opportunity |
|---|
| National Park Service Visitor Experience Study Apply for NPS NOIP15AC00089 Funding Number: NPS NOIP15AC00089 Agency: National Park Service Category: Natural Resources Funding Amount: Case Dependent |
| Noxious Weed Control in MT, ND and SD Apply for L15AS00004 Funding Number: L15AS00004 Agency: Bureau of Land Management Category: Natural Resources Funding Amount: $16,000 |
| Genetic Assessment of LCT Broodstock Apply for F15AS00051 Funding Number: F15AS00051 Agency: Fish and Wildlife Service Category: Natural Resources Funding Amount: Case Dependent |
| Desalination and Water Purification Research and Development (DWPR) Apply for R15AS00019 Funding Number: R15AS00019 Agency: Bureau of Reclamation Category: Natural Resources Funding Amount: $150,000 |
| Desalination and Water Purification Research and Development (DWPR) Pilot Apply for R15AS00021 Funding Number: R15AS00021 Agency: Bureau of Reclamation Category: Natural Resources Funding Amount: $400,000 |
| BLM OR/WA CESU Westside Mature Forest Study Apply for L15AS00005 Funding Number: L15AS00005 Agency: Bureau of Land Management Category: Natural Resources Funding Amount: $100,000 |
| Building an Integrated Data Harvester and Analysis Software for the Methow Basin with Future Linkages to Columbia River Basin Data Management Project Apply for R15AS00022 Funding Number: R15AS00022 Agency: Bureau of Reclamation Category: Natural Resources Funding Amount: $118,547 |
| BLM CA Abandoned Mine Lands with Department of Conservation Apply for L15AS00003 Funding Number: L15AS00003 Agency: Bureau of Land Management Category: Natural Resources Funding Amount: $1,500,000 |
| Water Conservation Field Services Program Apply for R15AS00025 Funding Number: R15AS00025 Agency: Bureau of Reclamation Category: Natural Resources Funding Amount: $75,000 |
| Notice of Intent to Award Sea Turtle Conservation Internship Apply for P15AS00021 Funding Number: P15AS00021 Agency: National Park Service Category: Natural Resources Funding Amount: Case Dependent |
| National Park Service Conduct a Training Program Repair Apply for NPS NOIP15AC00114 Funding Number: NPS NOIP15AC00114 Agency: National Park Service Category: Natural Resources Funding Amount: Case Dependent |
| National Park Service Intergovernmental Internship Cooperative Youth Partnership Project 2015 Apply for NPS NOIP15AC00121 Funding Number: NPS NOIP15AC00121 Agency: National Park Service Category: Natural Resources Funding Amount: Case Dependent |
| Intermediate range Climate Forecasting to Support Water Supply and Flood Control with a Regionally Focused Mesoscale Model Apply for R15AS00027 Funding Number: R15AS00027 Agency: Bureau of Reclamation Category: Natural Resources Funding Amount: $150,000 |
| Monitoring, and Outreach for Bald Eagles and Peregrine Falcons on the Channel Islands Apply for P15AS00024 Funding Number: P15AS00024 Agency: National Park Service Category: Natural Resources Funding Amount: Case Dependent |
| BLM OR WA Washington State Ready Reserve Program Fire Preparedness Apply for L15AS00006 Funding Number: L15AS00006 Agency: Bureau of Land Management Category: Natural Resources Funding Amount: $104,360 |
| Predation Rates and Use of Habitats and Wildlife Drinkers by Mountain Lions Apply for F15AS00056 Funding Number: F15AS00056 Agency: Fish and Wildlife Service Category: Natural Resources Funding Amount: $100,000 |
| BLM OR/WA CESU Managing Understories for Climate Change Apply for L15AS00011 Funding Number: L15AS00011 Agency: Bureau of Land Management Category: Natural Resources Funding Amount: $100,000 |
| LACC Cultural Landscape Stabilization Apply for P15AS00027 Funding Number: P15AS00027 Agency: National Park Service Category: Natural Resources Funding Amount: $40,039 |
| Development of Educational Digital Technology Tools Apply for P15AS00028 Funding Number: P15AS00028 Agency: National Park Service Category: Natural Resources Funding Amount: $103,168 |
| Forest Incomes for Environmental Sustainability Apply for RFI FIFES LIBERIA Funding Number: RFI FIFES LIBERIA Agency: Liberia USAID Monrovia Category: Natural Resources Funding Amount: $24,999,000 |
Grant application guides and resources
It is always free to apply for government grants. However the process may be very complex depending on the funding opportunity you are applying for. Let us help you!
Apply for Grants

Premium leads for funding administrators, grant writers, and loan issuers
Thousands of people visit our website for their funding needs every day. When a user creates a grant proposal and files for submission, we pass the information on to funding administrators, grant writers, and government loan issuers.
If you manage government grant programs, provide grant writing services, or issue personal or government loans, we can help you reach your audience.
Subscribe to Leads
Request more information:
Would you like to learn more about this funding opportunity, similar opportunities to "F15AS00043", eligibility, application service, and/or application tips? Submit an inquiry below:
Don't forget to subscribe to our grant alerts mailing list to receive weekly alerts on new and updated grant funding opportunities like this one in your email.
